Our construction crew are putting the finishing touches to a drainage job at sunny Seatoun Park for Wellington City Council. The team installed a 160mm perimeter collector drain and 1,900 metres of lateral drains at 5 metres spacings across the park over the last couple of weeks. Once the drain lines are sown and fertilised this week and goal mouths finished using a pedestrian seeder it'll be 'job done' and the locals can look forward to better drainage after wet weather. |
|
Archives
November 2024
Categories |